In progress
BKSB speedway stadium asphalt concrete surface and utility network renewal construction works – phases 1 and 2
2 Eizenšteina Street, Riga
Construction period: 12.2024. – In progress
The CSDD Biķernieki Complex Sports Base site is divided into two parts. The first part involves the construction of sewerage networks with stormwater drainage in the territory of the Biķernieki track. The second part involves the renewal of the speedway track surface using the recycling method.
-
Type:Infrastruktūra
-
Client:Государственное акционерное общество «Дирекция безопасности дорожного движения»
-
Architect:ООО «Firma L4»
-
General contractor:ООО «Pillar Contractor»
Location
Display external content from Google Maps.
Display external content from Google Maps.