Completed
M. Tāla Street and the connection between M. Tāla Street and P. Brieža Street
Connection between M. Tāla Street and P. Brieža Street
Construction period: 06.2016. – 03.2019.
Pillar Contractor, as the general contractor, carried out the street and engineering infrastructure construction project, which included the construction of the roadway and sidewalks, transformer buildings and pumping stations, as well as sewage and stormwater drainage systems. The project provided a complete transport and utility connection between Mihaila Tāla Street and Pulkveža Brieža Street, in compliance with building regulations and deadlines.
-
Type:Infrastruktūra
-
Client:Pillar Development SIA
-
Architect:Pillar Architekten SIA
-
General contractor:Pillar Contractor SIA