Completed
Carillon Aparthotel
Pils Street 13, Old Riga, Riga
Construction period: 09.2023. – 09.2025.
Latvian Construction Annual Award 2025: in the “Reconstruction” category, Pillar won 1st place
Pillar Contractor carried out the complete reconstruction of a culturally and historically valuable building in the UNESCO World Heritage Site “Historic Centre of Riga”, ensuring the careful integration of restoration work and modern engineering solutions. As part of the project, the historic façades, windows, stoves, stairwells and Art Nouveau details were restored, while 103 box-frame windows, 96 wooden windows, new lifts and floor structures (90% new) were installed. A full installation of engineering networks was carried out, along with reconstruction of the roof and restoration of the courtyard with granite paving; a structural glazing extension and façade lighting were also implemented, restoring a total of 3,772 m² of building area and ensuring its sustainable future use.
-
Type:Sabiedriska ēka
-
Client:Carillon Aparthotel SIA
-
Architect:AR/IN: VILNIS MIČULIS SIA, BK: AB Clausen Latvia, AVK/ŪK: Komforta Standarts SIA, EL: Daina EL SIA, ESS: REMA Project SIA, пожарная безопасность: VPM Latvija
-
General contractor:Pillar Contractor SIA
Location
Display external content from Google Maps.
Display external content from Google Maps.





















